Property:Issue

From AquaPedia Case Study Database
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
2
Flood Prevention: Coordination/trust/communication between local/community, regional/state, national levels required to inspect, monitor, report, and repair transboundary project infrastructure.  +, Flood Response: Limited communication (early warning) and limited response capacity lead to disastrous results.  +
A
The deterioration of water quantity and quality flowiníg into Mexico along the Colorado river following the inauguración of the Wellton-Mohawk project.  +, The bottom problem (inadequate drainage) was never addressed. With time, this situation plus the introduction of water from the Colorado River led to waterlogging farmlands.  +, Mexico could not utilize these water for irrigation purposes and was forced to allow it flow directly to the sea.  +
Access to Water for Irrigation  +, Hydro-electric power and other water development projects  +, Erosion and Sedimentation  +
Involvement of the European Union  +, Environmental Protection  +, Role of Arctic Council  +
B
ensuring construction projects are within the scope of what is permitted by the Treaty  +
C
Help develop capacity for greater efficiency in water supply, demand, and institutions throughout the Middle East, in support of bilateral peace negotiations.  +
Negotiating an equitable allocation of the flow of the Euphrates River and its tributaries among the riparian states of the Tigris-Euphrates Basin.  +
Unpredictability, limited knowledge and knowledge representation (models), and lack of information (data)  +, Water Contamination and Toxic Waste  +, Resettlement - cultural and archaeological loss - agricultural and livelyhood changes  +
Low reservoir elevations caused by drought threaten water allocations. How can States prepare for low-elevation reservoir conditions?  +
Maintaining water supply for agriculture and irrigation  +, Ensuring sufficient water for upstream municipal and industrial uses  +, Maintaining ecological health and sustaining fisheries in Florida’s Apalachicola Bay  +, Inter-state political tension  +
Negotiating an equitable allocation of the flow of the Indus River and its tributaries between the riparian states; developing a rational plan for integrated watershed development, and financing for development plans.  +
Major stakeholders in conflict over development in the Narmada River Basin  +, Stakeholder Categories and the Issues of Greatest Importance to Each Group  +
Water quantity. Nature or management issues?  +, Water for what? The water-food-energy nexus.  +
D
Water scarcity and water overuse  +, Population growth and infrastructure and social problems  +, Decreasing water quality and pollution  +, Climate Change  +, Institutional problems  +
E
Promoting and coordinating joint development of hydropower projects within the Salween Basin between the countries of Myanmar, Thailand, and China.  +
The environmental problems of the Aral Sea basin are among the worst in the world.  +
F
Recurring flooding of the downstream regions due to lack of multilateral cooperation for flood risk management. How can downstream countries convince the upstream riparian for cooperation?  +